Seudónimo Seudónimo
  • 02-06-2018
  • Mathematics
contestada

It takes 10 workers 24 hours to do a job.
Fill in the chart.

It takes 10 workers 24 hours to do a job Fill in the chart class=

Respuesta :

biggersis1968p8xgn0 biggersis1968p8xgn0
  • 02-06-2018
5 in 48 
10 in 24
20 in16
30 in12
40 in 8
50 in 4
Answer Link

Otras preguntas

solve for variable RS=3x+1 ST=1/2x+3 RT=18 please explain how you solve!
Explain the differences and similarities between personal property, real property, intangible property, and natural resources. also, provide an example of each
According to umatilla cosmology, what is the name for kennewick man, and what happened to him when his grave was disturbed?
The nurse is providing instructions to a client with a diagnosis of hypertension regarding high-sodium items to be avoided. the nurse instructs the client to av
Place the following cellular bonds in order from strongest to weakest (1 being strongest, 4 being weakest) Non-polar covalent lonic Hydrogen Bonds Polar Covalen
Gaby wants to make mini cupcakes for her math class. For every two students, she wants to provide three cupcakes. If there are 24 students total in class, how m
Examine the strength and weakness of nebular hypothesis
One problem with a bicameral legislature is that it is very easy to push through large-scale reforms. true /false
There are three levels of program implementation. describe each of them and the significance of each level of program implementation.
Use the following information as of december 31 to determine equity. liabilities $ 148,000 cash 64,000 equipment 213,000 buildings 182,000