liluv4590 liluv4590
  • 02-04-2019
  • Mathematics
contestada

A potter works 4 days a week, makes 14 pots per day on average, and charges $24 a pot. Money per 4-day workweek?

Respuesta :

greubel80
greubel80 greubel80
  • 02-04-2019
Step by Step:

14 average pots x 4 days a week = average money made

14x4= 56

56 pots a 4-day week x 24$ a pot

56x24 = 1344$
Answer Link

Otras preguntas

5kg object with two forces acting on it: 8N to the right and 3N to the left. calculate the acceleration of the object
do all cells replicate their dna​
can somebody please help me, this is due in 20 minutes​
Determine whether a triangle with the given side lengths is a right triangle: 8 cm, 10 cm, 12 cm
Which of the following is true of the planet Earth?
i need help 50 pts plz asap
I WILL BRAINLIST YOU​
Is it possible to be sad at the end of an anime?
A number is subtracted from 5 if the result is 1 find the number​
Im a single Pringle and I miss my BF even tho we never even really broke up. Know what I sheeein