amberlemjudd amberlemjudd
  • 01-05-2020
  • Mathematics
contestada

it took 20 000 workers to build taj mahal in 20 years how long would it take to build if they had 8,000 workers

Respuesta :

coltongarretttanner coltongarretttanner
  • 01-05-2020

Answer:

50 years

Step-by-step explanation:

Answer Link
whyme533249
whyme533249 whyme533249
  • 01-05-2020

Answer:

160 years

Step-by-step explanation:

20/20000=0.001

0.001 x 8 x 20 = 160

Answer Link

Otras preguntas

in what ways is climate controlled by the sun and the water cycle ?
What are two different ways to describe and label the layers of the Earth?
Can u paraphrase the quote ”let things take their course”
.is a pot holder a conductor or a insulator
What two major processes are involved in the oxygen cycle?
A passenger on a boat moving at 1.70 m/s on a still lake walks up a flight of stairs at a speed of 0.60 m/s , as shown in the figure . The stairs are angled at
Why is RNA necessary to act as messenger?
A passenger on a boat moving at 1.70 m/s on a still lake walks up a flight of stairs at a speed of 0.60 m/s , as shown in the figure . The stairs are angled at
Why is RNA necessary to act as messenger?
Trying to translate word problems. Five times the sum of 3 and twice some number is 70. what is the number?