jaylenlouissaint11 jaylenlouissaint11
  • 03-12-2020
  • Arts
contestada

Which are the planning, design, building,and implementation phases considered to be

Respuesta :

obzooaz
obzooaz obzooaz
  • 03-12-2020

Answer:

Whether you're in charge of developing a website, designing a car, moving a department to a new facility, updating an information system, or just about any other project (large or small), you'll go through the same four phases of project management: planning, build-up, implementation, and closeout.

Explanation:

Answer Link

Otras preguntas

Why does the judicial branch, as opposed to the executive or legislative branch have the power of judicial review
What legal reforms did Justinian actually make?
Why do lipophilic hormones require carrier proteins while being transported in the blood?
True or false The ancient Egyptian desert made travel and trade easy
In invading maryland, one of general lee's key objectives was to
In pea plants, purple flowers are dominant over white flowers. Which of the following represents a pea plant with white flowers?
Read this story summary: A tortoise and a hare have a race. After the race begins, the hare fools around and even stops to takes a nap, believing he will be t
why does many children have the same phenotypic characteristics as their parents?
If the test scores of a class of 36 students have a mean of 75.2 and the test scores of another class of 28 students have a mean of 67.4, then the mean of the c
A bob of mass of 0.18 kilograms is released from a height of 45 meters above the ground level. What is the value of the kinetic energy gained by the bob at the