When multiple architects work on a construction plan, which section of a construction plan will help them keep track of when the changes are made and by whom?
A.
framing plan
B.
schedule
C.
title block
D.
bill of materials

Respuesta :

katusukibakugoisgod
katusukibakugoisgod katusukibakugoisgod
  • 07-12-2020

Answer:

I believe that it is . A. framing plan

Explanation:

But I am not certain But I do know that it IS NOT B..

Answer Link
ewachi101 ewachi101
  • 26-08-2021

Answer:

the answer is schedule!!!

Explanation:

Answer Link

Otras preguntas

Nano3 dinitrogen oxide, also known as laughing gas, is a sweet-tasting gas used in dentistry. when solid ammonium nitrate is heated, the products are gaseous wa
A fishing tackle box is 13 inches long 6 inches wide and 2 and a half inches high what is the volume of the tackle bix
Why don’t the present shapes of the continents fit perfectly in to a supercontinent
What is the molarity of a solution that contains 2.35 g of nh3 in 0.0500 l of solution?
A wave passes a point 80 times per second what is the frequency
When the poet juvenal said "there's only two things that concern them: breas and circuses", he was talking about?
The two polygons above are similar. The scale factor of the smaller polygon to the larger polygon is 3. The area of the smaller polygon is 12 sq. units. What is
Which of the following is a group of cells that sends signals to control the heart rate? Atrium Pacemaker Septum Valve
How many formula units make up 15.0 g of magnesium chloride (MgCl2)?
Fill in the correct terms to complete the description of how Ben used social media to promote a new product. Ben is in charge of launching a new game for gaming