medm0om5iebernan medm0om5iebernan
  • 01-11-2016
  • Mathematics
contestada

A construction company delivered 40 loads of concrete in 5 days.

What was their rate of work?



A.




B.




C.




D.


Respuesta :

melhunt99
melhunt99 melhunt99
  • 05-11-2016
Well 40 divided by 5 is 8 and you don't have options so I would say 8 loads a day :)
Answer Link

Otras preguntas

Metaphorically, why do you think Cassius is the only conspirator with his hood down?
If the university's school of engineering can earn 4% on it's investments, how much should be in it's savings account to fund one $5000 scholarship each year fo
they're 15 people total 5 from Arizona 7 from California 3 from Nevada what is the probability not all people are from Arizona?​
how do i delete this question ill give u extra points for an answer lol
what is the connection between social sciences and the applied social sciences?​
why would body temperature be a negative feedback loop?​
Question 2 of 10 Suppose a population consists of 500,000 people. Which of the following numbers of members of the population being surveyed could result in a s
A sample of an unknown liquid has a volume of 24.0ml and a mass of 6g. What is it’s density? Show your work.
What genre of music did Rock bands play in Haight Ashbury to raise money for the community and as part of their community rituals of mediation?
B 9.4079.4079.470806014. The number of hours in 80 minutes isSelect all that apply.Which of these statements is trueThe number of hours in decimal form is 1.3.T