8 students take 18 hours to construct a raft.
If the raft needs to be completed 12 hours earlier, calculate how many more students are needed.

Respuesta :

devishri1977
devishri1977 devishri1977
  • 04-08-2021

Answer:

16

Step-by-step explanation:

Students                      8       x

Time taken (hours)     18     18 - 12 = 6

If number of students increases, the work will completed in less hours.

So inverse proportion

[tex]x =\frac{18*8}{6}=3*8 = 24[/tex]

Additional students required = 24 - 8 = 16

Answer Link

Otras preguntas

what is the slope of the line represented by the equation 4x+3y=12
What is a instrument that measures precipitation?
a specialized dictionary is one that
The part of the brain responsible for voluntary, or conscious, body activities and emotions is located in the Frontal Lobe or Cerebrum o.O
0.2(x+50)-6=0.4(3x+20)
The radio transmitter and aerial radio antenna was an innovation of A. Guglielmo Marconi B. Thomas Edison C. Alexander Graham Bell D. Jean Lenoir E. Gustav
if the ones digit of a numbers greater than 1 is 0, what factor or factors must that number have?
in what part of chloroplasts do dark reactions occur?
Write a power represented with a positive base and a positive exponent whose value is less than the base.
Why did Austria Hungary seek German support before invading Bosnia?