In a project network, the critical path is the sequence of activities which has the:________.

Respuesta :

66hello60
66hello60 66hello60
  • 03-08-2022

Answer:

The correct answer is the longest time

Answer Link

Otras preguntas

Find the rule and the graph of the function whose graph can be obtained by performing the translation 4 units right and 3 units down on the parent function f(x)
3. A representative of the government(a prosecution team) must bring forth charges
What if the Ferris wheel below had equally spaced seats, such that the central angle were 20∘. If the radius of the Ferris wheel is 20 feet. How far is the spac
Why are the non-living things important to an ecosystem?
3. All the deer in Horry County represent which of the following? species biome population community
I need help ASAP please answer quickly
87 7/40 as a decimal
Which idea did the colonists adopt from the Magna Carta? A. due process B. free elections C. limited government D. social contract
Write an expression that is equivalent to 3(7+).
5. Who came up with the plan to end the argument over free and slave states? * Henry Clay Congress the president the Louisiana Purchase