rsetser435 rsetser435
  • 02-11-2017
  • Business
contestada

Each task in a systems development project should culminate in one or more ________.

Respuesta :

920michaedlewis 920michaedlewis
  • 02-11-2017
deliverables is the answer
Answer Link

Otras preguntas

Two species that occasionally mate and produce zygotes but which have incompatible genes that precent the resulting embryo from developing are separated by
____ the word used for the day the war ended and that literally meant “stop shooting”
shaunika is filling her swimming pool the pool has 21 inches of water in it she wants it to have 42 inches of water how many more inches of water does she need
write another way to group the factors 2×(3×1)
Using Newton's laws, describe what happens to your body when you get in a car crash. Why is important to wear a seat belt and have airbags? 1pt- describing wha
If the mass of a material is 41 grams and the volume of the material is 5 cm^3, what would the density of the material be? answer: Units:
How do you think art changed since the invention of perspective?
Paige mows 1/6 acre in 1/4 hour.how many acres does Paige mow per hour?
How many times hotter than the sun surface is the surface of a star the same size but gives off twice the amount of energy per second?
Choose the correct form of the verb for each sentence. Mis amigos __________ a la fiesta de cumpleaños. (2 points) vamos van va voy